All SWMS's

This bundle includes all currently available SWMS's at a significant discount.
This SWMS includes the following:
- Legislation
- Training
- General worker health management and general work zone set up
- Delivery of plant to site
- Mobile plant operations
- Set up of site amenities
- Identification of services
- Electrical
- Laying of pipes and drains
- Placing ballast on hard stand
- Placement of site sheds
- Installation of covered walkways
- Installation of roof sections
- Clean up
Everything you need to cover your site establishment needs when setting up your site sheds, amenities, covered walkways and fencing etc. Get a 10% discount when you purchase this bundle. Our site start up bundle includes the following SWMS documents:
- Site Establishment
- Manual Handling
- Installation of temporary fence panels
- Deliveries
to site
- Housekeeping and cleaning of site amenities
As the installation of structural steel will likely involve mobile plant (crane, EWP etc) and could be related to temporary structures then you will require a SWMS to undertake this work
Get a 10% discount when you purchase a bundle. Our structural steel bundle includes the following SWMS documents:
- Erection
of Structural Steel
- Manual
Handling
- Operation of Mobile Crane
- Tower crane – General lifting operations
- Work at
height
- Use of
Harness
- Deliveries to site
- Welding
- Use of Boom EWP
- Use of scissor lift
Want to look more professional with your WHSE management. Our subcontractor WHSE Plan is perfect for small businesses who are required to submit a Safety & Environmental Plan to the Client or Head Contractor. You can add your logo for a professional looking document and you can tailor it specifically to each project. It is bound to help you win more work.
Our Subby WHSE Plan includes the following:
- Project details
- Policies (Safety Policy, Drug & Alcohol Policy, Harassment & Discrimination Policy, Working in Heat Policy, Environmental Policy)
- Risk Management
- Objectives
- Competence, Assessment and Training
- Asbestos Management
- Concrete Dust Management (Silicosis)
- Calibration
- Electrical
- Fatigue Management
- Hand Tools
- Hazardous Substances & Chemicals
- Incident Management
- Issue Resolution
- Lasers
- Transport and Deloiveries - HVNL
- Manual Handling
- Mobile Plant
- SWMS Template (Blank)
- Site Induction
- Work at Height
- Return to Work and Rehabilitation (Australia only)
- Standard Forms: Training & Competency Register, Toolbox Meeting, Prestart Meeting, Plant & Equipment Register, Plant Induction, Temporary Handrail Installation Checklist, Hazardous Substance & Dangerous Goods Register, Electrical Equipment Test/Tag Register, Harness Register, Hazard Report, Register of Injuries, Incident Report, Return to work plan (for Australia), Calibration register, Hazardous Manual Handling Assessment.
If your work location could result in a falls from greater than 2 meters then you will legally need a SWMS when working in Australia.
Get a 10% discount when you purchase a bundle. Our temporary handrail bundle includes the following SWMS documents:
- Temporary
Handrail Installation
- Manual
Handling
- Work at
height
- Use of Harness
- Deliveries to site
This SWMS includes the following:
- Legislation
- Training
- General worker health management and general work zone set up
- Delivery of materials to site
- General work area set up
- Installation and removal of handrail
- Install stanchions
- Install handrails
- Clean up
This SWMS includes the following:
- Legislation
- Training
- General worker health management and general work zone set up
- Delivery of plant to site
- General set up
- Laying floor sheets
- Fixing ceiling joists and upper level floor joists
- Wall framing
- Installation of roof trusses and battens
- Constructing a conventional roof
- Clean up
This SWMS includes the following:
- Legislation
- Training
- General worker health management and general work zone set up
- Initial inspections
- Communication
- Pre Operational tool and equipment check
- Preparation for crane operation
- Public safety
- Traffic management
- Use of lifting gear
- Dogging of crane
- Assess the load
- Slinging the load
- Directing the load
- Landing loads
- Releasing chains/slings
- Storage of lifting gear
- Bins and lifting boxes/cages
- Post operational checks and maintenance
- Access tower
This SWMS includes the following:
- Legislation
- Training
- General worker health management and general work zone set up
- General set up
- Use of explosive power tool
- Storage of EPT
- Cleaning and maintenance