Menu
Your Cart

Mobile Plant

Mobile Plant
Find SWMS’s for the most used mobile plant items. It is a legal requirement in Australia to provide a SWMS for the operation of all mobile plant. Can't find what you want? Let us know so we can add it.

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Identification of services
  • Cutting/drilling concrete suspended slab and brick walls
  • Cutting/drilling into post tension floors
  • Core hole drilling
  • Clean up
  • Refueling
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of plant and materials to site
  • Offloading mobile plant from truck/trailer
  • Offloading plant from truck/tilt tray
$85.00

This SWMS covers the operations of an excavator and skid steer and includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of plant to site
  • Check work area for operational hazards
  • Attach bucket
  • Excavate and load materials
  • Using excavator to lift and load materials
  • Working in close proximity to overhead power lines
  • Using a skid steer loader for loading soil into truck
  • Refueling 
  • Emergency rescue procedure - contact with electrical services
  • Emergency rescue procedure - soil collapse
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Manual Handling - General
  • Moving tools to work location
$85.00

Get a 10% discount when you purchase a bundle. Our mobile plant bundle includes the following SWMS documents:

  • Use of Boom/Elevated Work Platform
  • Use of Scissor Lift
  • Use of Excavator/Skid Steer
  • Use of Forklift and Telehandler
  • Operation of crawler Crane
  • Operation of mobile crane
  • Use of Bobcat
  • Operation of Crane truck
  • Use of Roller and Compactor
  • Use of Swing Stage
  • Deliveries to Site
  • Operation of Franna
  • Operation of Concrete Boom Pump 
$1,007.50

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of plant to site
  • General set up
  • Maintenance and pre start inspections
  • Review of work area
  • Compaction works
  • Clean up
  • Refueling
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of plant to site
  • General set up
  • Check work area for operational hazards
  • Operating and working from Scissor lift
  • Securing Scissor lift after use
  • Charging batteries
  • Emergency rescue procedure
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management
  • Use of swing stage
  • Clean up
$90.00
Showing 1 to 8 of 8 (1 Pages)