Menu
Your Cart

Concrete Blinding

Concrete Blinding
Hot
Concrete Blinding

Description

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and work zone set up
  • Pouring concrete from truck chute
  • Use and set up of concrete pump
  • Cutting and placing height pins
  • Setup of concrete boom
  • Position of concrete trucks
  • Pump operation
  • Discharging concrete
  • Position concrete 
  • Finishing concrete
  • Blow out hose
  • Clean up
$85.00
  • Stock: In Stock
  • Model: SWMS-51

Available Options

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and work zone set up
  • Pouring concrete from truck chute
  • Use and set up of concrete pump
  • Cutting and placing height pins
  • Setup of concrete boom
  • Position of concrete trucks
  • Pump operation
  • Discharging concrete
  • Position concrete 
  • Finishing concrete
  • Blow out hose
  • Clean up

Write a review

Please login or register to review

Wondering how SWMS file looks like?

Download a sample SWMS

 DOWNLOAD SAMPLE SWMS