Menu
Your Cart

All SWMS's

All SWMS's

This bundle includes all currently available SWMS's at a significant discount. 

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Work zone access
  • Blow out columns with air compressor
  • Move grout to work zone
  • Water supply
  • Generator use
  • Mix grout
  • Application of grout
  • Grinding concrete
  • Clean up
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Manual handling
  • Moving equipment to work location
  • Cleaning toilets and amenities
$80.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Set up work zone
  • Install and repair sanitary fixtures
  • Clean up
$85.00

This SWMS covers the following:

  • Pre-planning checks
  • Delivery of materials
  • Engineering requirements 
  • Installation methods
  • Use of loading bay
  • Removal of loading bay
  • Hold points
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • General planning
  • Delivery of precast to site
  • Setting up mobile plant
  • Preparation of erection and work zone
  • Installation braces and props
  • Slinging the load
  • Lifting of precast panels
  • Lifting/rotating panels
  • Rotation of panels
  • Lifting panels
  • Placement and securing of props
  • Removal of props/braces
  • Use of spreader beam
  • Use of telehandler
  • Grouting of panels
$95.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of plant to site
  • Pipe laser
  • Installation of pipe work
  • Bedding and laying pipework
  • Hazardous substances
  • Clean up
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of materials to site
  • Use of electrical tools
  • Work zone set out
  • Installation of fence panels with concrete base blocks
  • Installation of fence panels with star pickets 
  • Tie off secure fence panels
  • Removal of star pickets
  • Final checks/clean up
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of materials to site
  • Set up of work zone
  • Set up of mixer and brick elevator
  • Mixing materials and transporting to work area
  • Laying of bricks and blocks
  • Use of electric brick saw
  • Use of brick elevator
  • Shoring up free standing walls
  • Cleaning bricks and blocks using hydrochloric acid
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Manual Handling - General
  • Moving tools to work location
$80.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • General Planning
  • Operation of train truck
  • Rigging, slinging, dogging
  • Clean up
  • Legislation
  • Training
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of plant to site
  • General Set Up
  • Crane operation - General Lifting
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of plant to site
  • General set up
  • Crane operation - general lifting
$85.00