Menu
Your Cart

All SWMS's

All SWMS's

This bundle includes all currently available SWMS's at a significant discount. 

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Pre-Start design
  • Work zone preparation
  • Delivery and unloading of material
  • General - Erecting, altering and dismantling formwork
  • Erection of H-Frames
  • Erection of conventional formwork from below deck
  • Accessing working deck
  • Erection of temporary handrail to deck and installation of soffit infills
  • General work on deck
  • High wind management
  • Pre-pour checks
  • Stripping and dismantling of formwork
  • Clean up
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management
  • General planning
  • Manual handling
  • Unloading and transporting material to work area
  • Assess accessing areas at height
  • Cutting of MDF product
  • Handheld power tool operation and maintenance
  • Clean up
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Work zone access
  • Blow out columns with air compressor
  • Move grout to work zone
  • Water supply
  • Generator use
  • Mix grout
  • Application of grout
  • Grinding concrete
  • Clean up
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Manual handling
  • Moving equipment to work location
  • Cleaning toilets and amenities
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Set up work zone
  • Install and repair sanitary fixtures
  • Clean up
$85.00

This SWMS covers the following:

  • Pre-planning checks
  • Delivery of materials
  • Engineering requirements 
  • Installation methods
  • Use of loading bay
  • Removal of loading bay
  • Hold points
$85.00
Installation of Precast Concrete Panels
New Hot

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • General planning
  • Delivery of precast to site
  • Setting up mobile plant
  • Preparation of erection and work zone
  • Installation braces and props
  • Slinging the load
  • Lifting of precast panels
  • Lifting/rotating panels
  • Rotation of panels
  • Lifting panels
  • Placement and securing of props
  • Removal of props/braces
  • Use of spreader beam
  • Use of telehandler
  • Grouting of panels
$95.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Accessing roof
  • Secure roof truss and battens
  • Installation of safety mesh
  • Insulation
  • Cutting and lifting sheets onto roof
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of plant to site
  • Pipe laser
  • Installation of pipe work
  • Bedding and laying pipework
  • Hazardous substances
  • Clean up
$85.00