Menu
Your Cart

Formwork/Steel Fixing

Formwork/Steel Fixing
Formwork and steel fixing generates a significant number of injuries each year. Be sure that your employees are trained in safe practices and that you are covering your duty of care obligations under the law to provide a SWMS for all works related to temporary load-bearing support structures.

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Pouring from concrete truck chute
  • Use and set up of mobile and static concrete pump
  • Commence pour
  • Use of kibble
  • Concrete shoveling/screeding
  • Concrete vibrating
  • Operation of helicopter float
  • Bull float and hand troweling
  • Curing
  • Clean up
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Storage of MDF products
  • Setting up a cutting room
  • Cleaning up
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of plant and materials to site
  • Offloading mobile plant from truck/trailer
  • Offloading plant from truck/tilt tray
$85.00

Get a 10% discount when you purchase a bundle. Our formwork/steel fixing bundle includes the following SWMS documents:

  • Formwork Conventional – Erection and stripping
  • Steel Fixing
  • Manual Handling
  • Work at height
  • Use of Harness
  • Operation of Mobile Crane
  • Tower crane – General lifting operations
  • Concrete Cutting and Drilling
  • Patching, levelling and grinding of concrete
  • Concreting
  • Deliveries to site 
$846.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Manual Handling - General
  • Moving tools to work location
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Initial inspections
  • Communication
  • Pre Operational tool and equipment check
  • Preparation for crane operation
  • Public safety
  • Traffic management
  • Use of lifting gear
  • Dogging of crane
  • Assess the load
  • Slinging the load
  • Directing the load
  • Landing loads
  • Releasing chains/slings
  • Storage of lifting gear
  • Bins and lifting boxes/cages
  • Post operational checks and maintenance
  • Access tower
$85.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Delivery of plant to site
  • General set up
  • Putting on a harness
  • Working from harness
  • Finish and clean up
  • Rescue procedure for fall arrest
$90.00

This SWMS includes the following:

  • Legislation
  • Training
  • General worker health management and general work zone set up
  • Working at height - general
  • Access to work area and general set up
  • Fixed scaffold erection
  • Mobile scaffold erection
  • Working on scaffold - access/egress
  • Working on scaffold general
  • Harness use/fall restraint
  • Working with harness in area with no fall protection
  • Use of hand tools at height
  • Use of ladders for access
  • Ladder use - General
  • Using an A frame ladder and step ladder
  • Penetrations - Working in and around penetrations
  • Plant access to undertake maintenance and repairs
$90.00
Showing 1 to 8 of 8 (1 Pages)